Customer Requirements:
*2 robots, 2 cooling extruding machines and a 4-axis hydraulic machine complete twice extrusion moulding of a rod; Extruding workpiece: Phosphatized rod;
*One robot loads material and another unloads material from the 1 nd hydraulic machine, then loads material to the 2 and last unloads.
Application Effect:
*For shaft parts, it uses rolling-magazine loading type (including positioning, separating structure) to ensure more than 2 hours automatic production;
*Preset clearance between the part and hydraulic machine's grinding apparatus is 0.08mm, which effectively demonstrates the RB08 robot's repeated precision (the moulding does not increase auxiliary positioning device);
*Compared to the original manual work, two RB08 robots cooperating shortens wait time of two operations, and one complete workpiece process period is 30s;
*That the higher flexible of RB08 makes it can be avoided the obstacle with the obstacle with the suitable posture even in the narrow space;
*Humanized operation programming makes customers be ffamiliar with and know well operations, and shortens input use time.